After-sales Service: | 24 Hours Online |
---|---|
Type: | Steel Plate |
Standard: | ASTM, AISI, GB, JIS, DIN, BS |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name
|
Galvanized Steel Sheet
|
Standard
|
AISI, ASTM, BS, DIN, GB, JIS
|
Thickness
|
0.25-2 mm or as your request
|
Normal Width
|
1250mm 1500mm 1800mm 2000mm etc.
|
Length
|
Customers' Requirement
|
Technique
|
Hot dipped,hot rolled
|
Place of Origin
|
Jiangsu,China
|
Suface Treatment
|
Galvanized
|
Price Terms
|
Ex-Work,FOB,CFR,CIF,FCA,etc
|
MOQ
|
5 Tons
|
Supply Ability
|
5000 Tons / Month
|
Payment Terms
|
T/T
|
Place of Loading | Shanghai Port |
Delivery Time | Shipped in 7-10 days,according to the specific order |
Galvanized Steel Sheet Gauge Chart | ||
Gauge | mm | Inches |
8 | 4.27 | 0.1681 |
9 | 3.89 | 0.1532 |
10 | 3.51 | 0.1382 |
11 | 3.13 | 0.1233 |
12 | 2.75 | 0.1084 |
14 | 1.99 | 0.0785 |
16 | 1.61 | 0.0635 |
18 | 1.31 | 0.0516 |
20 | 1.01 | 0.0396 |
21 | 0.93 | 0.0366 |
22 | 0.85 | 0.0336 |
23 | 0.78 | 0.0306 |
24 | 0.7 | 0.0276 |
25 | 0.63 | 0.0247 |
26 | 0.55 | 0.0217 |
27 | 0.51 | 0.0202 |
28 | 0.47 | 0.0187 |
30 | 0.4 | 0.0157 |
Standard | GB/T 2518 | EN10346 | JIS G 3141 | ASTM A663 |
Grade | DX51D+Z | DX51D+Z | SGCC | CS Type C |
DX52D+Z | DX52D+Z | SGCD1 | CSTypeA.B | |
DX53D+Z | DX53D+Z | SGCD2 | FS Type A, B | |
DX54D+Z | DX54D+Z | SGCD3 | DDS Type C | |
S250GD+Z | S250GD+Z | SGC340 | SS255 | |
S280GD+Z | S280GD+Z | SGC400 | SS275 | |
S320GD+Z | S320GD+Z | - | - | |
S350GD+Z | S350GD+Z | SGC440 | SS340 Class4 | |
S550GD+Z | S550GD+Z | SGC590 | SS550 Class2 |
Grade | Yield strength MPa | Tensile strength MPa | Fracture elongetion not less than % |
DX51D+Z | 270-500 | 22 | |
DX52D+Z | 140-300 | 270-420 | 26 |
DX53D+Z | 140-260 | 270-380 | 30 |
DX54D+Z | 120-220 | 260-350 | 36 |
DX56D+Z | 120-180 | 260-350 | 39 |
Base metal type | Grade | CHEMICAL COMPOSITION % | |||
C | Si | Mn | P | ||
Cold rolled steel sheet | DC51D+Z (St01Z, St02Z, St03Z) , DC51D+ZF | ≤0.10 | - | ≤0.50 | ≤0.035 |
DC52D+Z (St04Z), DC52D+ZF | ≤0.08 | - | ≤0.45 | ≤0.030 | |
DC53D+Z (St05Z), DC53D+ZF | ≤0.08 | - | ≤0.40 | ≤0.030 | |
DC54D+Z (St06Z), DC54D+ZF | ≤0.01 | ≤0.10 | ≤0.30 | ≤0.025 | |
DC56D+Z (St07Z), DC56D+ZF | ≤0.01 | ≤0.10 | ≤0.30 | ≤0.025 | |
Hot rolled steel sheet | DD51D+Z (St01ZR, St02ZR) | ≤0.10 | - | ≤0.50 | ≤0.035 |
DD54D+Z (St06ZR) | ≤0.01 | ≤0.10 | ≤0.30 | ≤0.025 |
1. Hot galvanized sheet is primarily utilized in agricultural machinery, grain storage facilities, and high-speed guardrail sectors. Its remarkable attributes include low cost and exceptional added value, making it an indispensable choice for these industries.
2. Galvanized sheet also finds extensive use in building materials, home appliances, and the automotive sector. These industries frequently rely on steel support structures. The introduction of galvanized sheets provides an ingenious solution to this necessity, ensuring durability and efficiency. The demand for galvanized sheets is poised to soar in the future.
3. Beyond industrial production, galvanized sheets are integral to modern buildings, factories, spatial structures, transportation, and energy sectors. In these applications, galvanized sheets serve as a protective film, significantly reducing external erosion and enhancing longevity.
Q: What are your terms of payment?
A: We require a 30% TT payment in advance, with the remaining balance to be paid before loading.
Q: Could you provide a sample?
A: Absolutely, we would be honored to offer you samples to ensure the quality meets your standards.
Q: How is the quality of your products?
A: Our products adhere to stringent national and international standards, and each item undergoes rigorous testing before dispatch. Should you require our quality certifications and various testing reports, please don't hesitate to request them from us.
Q: How long does it take for samples and mass production?
A: Typically, it takes 3-5 days for ready molds, 15-20 days for new molds and samples after confirmation, and 25-30 days for mass production.