After-sales Service: | 24 Hours Online |
---|---|
Type: | Steel Plate |
Standard: | ASTM, AISI, GB, JIS, DIN, BS |
Still deciding? Get samples of US$ 100/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name
|
Galvanized Steel Sheet
|
Standard
|
AISI, ASTM, BS, DIN, GB, JIS
|
Thickness
|
0.25-2 mm or as your request
|
Normal Width
|
1250mm 1500mm 1800mm 2000mm etc.
|
Length
|
Customers' Requirement
|
Technique
|
Hot dipped,hot rolled
|
Place of Origin
|
Jiangsu,China
|
Suface Treatment
|
Galvanized
|
Price Terms
|
Ex-Work,FOB,CFR,CIF,FCA,etc
|
MOQ
|
5 Tons
|
Supply Ability
|
5000 Tons / Month
|
Payment Terms
|
T/T
|
Place of Loading | Shanghai Port |
Delivery Time | Shipped in 7-10 days,according to the specific order |
Galvanized Steel Sheet Gauge Chart | ||
Gauge | mm | Inches |
8 | 4.27 | 0.1681 |
9 | 3.89 | 0.1532 |
10 | 3.51 | 0.1382 |
11 | 3.13 | 0.1233 |
12 | 2.75 | 0.1084 |
14 | 1.99 | 0.0785 |
16 | 1.61 | 0.0635 |
18 | 1.31 | 0.0516 |
20 | 1.01 | 0.0396 |
21 | 0.93 | 0.0366 |
22 | 0.85 | 0.0336 |
23 | 0.78 | 0.0306 |
24 | 0.7 | 0.0276 |
25 | 0.63 | 0.0247 |
26 | 0.55 | 0.0217 |
27 | 0.51 | 0.0202 |
28 | 0.47 | 0.0187 |
30 | 0.4 | 0.0157 |
Standard | GB/T 2518 | EN10346 | JIS G 3141 | ASTM A663 |
Grade | DX51D+Z | DX51D+Z | SGCC | CS Type C |
DX52D+Z | DX52D+Z | SGCD1 | CSTypeA.B | |
DX53D+Z | DX53D+Z | SGCD2 | FS Type A, B | |
DX54D+Z | DX54D+Z | SGCD3 | DDS Type C | |
S250GD+Z | S250GD+Z | SGC340 | SS255 | |
S280GD+Z | S280GD+Z | SGC400 | SS275 | |
S320GD+Z | S320GD+Z | - | - | |
S350GD+Z | S350GD+Z | SGC440 | SS340 Class4 | |
S550GD+Z | S550GD+Z | SGC590 | SS550 Class2 |
Grade | Yield strength MPa | Tensile strength MPa | Fracture elongetion not less than % |
DX51D+Z | 270-500 | 22 | |
DX52D+Z | 140-300 | 270-420 | 26 |
DX53D+Z | 140-260 | 270-380 | 30 |
DX54D+Z | 120-220 | 260-350 | 36 |
DX56D+Z | 120-180 | 260-350 | 39 |
Base metal type | Grade | CHEMICAL COMPOSITION % | |||
C | Si | Mn | P | ||
Cold rolled steel sheet | DC51D+Z (St01Z, St02Z, St03Z) , DC51D+ZF | ≤0.10 | - | ≤0.50 | ≤0.035 |
DC52D+Z (St04Z), DC52D+ZF | ≤0.08 | - | ≤0.45 | ≤0.030 | |
DC53D+Z (St05Z), DC53D+ZF | ≤0.08 | - | ≤0.40 | ≤0.030 | |
DC54D+Z (St06Z), DC54D+ZF | ≤0.01 | ≤0.10 | ≤0.30 | ≤0.025 | |
DC56D+Z (St07Z), DC56D+ZF | ≤0.01 | ≤0.10 | ≤0.30 | ≤0.025 | |
Hot rolled steel sheet | DD51D+Z (St01ZR, St02ZR) | ≤0.10 | - | ≤0.50 | ≤0.035 |
DD54D+Z (St06ZR) | ≤0.01 | ≤0.10 | ≤0.30 | ≤0.025 |
1. Hot galvanized sheet is primarily utilized in the agricultural machinery, grain storage, and high-speed guardrail sectors. Its remarkable attributes include cost-effectiveness and significant added value, making it an indispensable material in everyday life.
2. Galvanized sheet is also extensively employed in the construction, home appliance, and automotive industries. These sectors frequently require robust steel structures, and the introduction of galvanized sheets provides an ingenious solution. As these industries evolve, the demand for galvanized sheets is expected to rise steadily.
3. Beyond industrial production, galvanized sheets are crucial in modern architecture, factories, spatial structures, transportation, and energy sectors. These sheets primarily serve as a protective barrier, significantly reducing external erosion and enhancing the longevity of the structures they support.
Q: What are your terms of payment?
A: We require a 30% TT payment in advance, with the remaining balance due before loading.
Q: Can you provide samples?
A: Absolutely, we are pleased to offer samples for you to check our product quality.
Q: How would you describe the quality of your products?
A: Our products adhere to both national and international standards, undergoing rigorous testing before dispatch. If you wish to review our quality certifications and detailed testing reports, please do not hesitate to request them from us.
Q: What is the timeline for sample preparation and mass production?
A: Generally, it takes 3-5 days for ready molds, 15-20 days for new molds and samples after confirmation, and 25-30 days for mass production.